Our Experience

Since the early 1960s, the Graycliff Federal leadership team has plowed and trenched thousands of miles of copper cables. In addition, we have successfully completed numerous aerial cable plant and manhole/duct bank system installations. We were among the first in the United States to bury long-haul fiber optic cable, and have installed hundreds of thousands of feet of inside voice, data and video cable.
Many of our projects have involved working in High Security areas for both commercial and military clients, within as well as outside the borders of the United States. We are familiar with all DOD security requirements and maintain rigorous internal screening procedures to ensure the highest levels of security.
Some of our more significant projects have included:

Fort Lee, VA
  • Underground installation of Outside Plant copper and single mode fiber cable.
  • Placing new manholes and building entries.
  • Installation of new dedicated electrical circuits with disconnect switches and surge suppressors for new and existing data equipment.
  • Installation of new voice and data wiring centers.
  • Installation, fusion splicing, termination and testing of new fiber optic and copper cables
  • Involves approximately 100 wiring centers.

Ft Stewart,
Hunter Army Air Field, GA-I3MP Contract-in 2007,

  • Completed an extensive contract to upgrade both bases under the I3MP contract over a period of 3 years. 
  • Engineered 95% complete drawings for construction and completed all drafting for final 100% Red Lined Drawings submitted to federal government. 
  • Plowed, trenched or pulled through duct for approximately 150 miles of a DWDM fiber ring (NZDSF Cable) and copper cables.
  • Placed more than 50 manholes
  • Trenched approximately 15 miles of 2, 4, 6, 8, and 9 way conduit encased in concrete. 
  • Spliced, terminated and tested all fiber and copper cables, existing or new, and provided test results in a final deliverable package to the government. 
  • At the ribbon cutting ceremony, the officer in charge of the U.S. Army’s IMOD project, Colonel Miller, singled out our team for special accolades.

Fort Gillem, GA

  • Furnished, installed, tested and cutover an I3MP complete upgrade implementation, encompassing Outside Plant, Outside Rehabilitation, Data, Voice, Inside Plant, and Electrical Circuits.
  • Built new 40’x 80’ operational DCO.
  • Cut over approximately 36,000 circuits from old Central Office to new Central Office with no outage.

Fort McPherson, GA

  • Underground installation of Outside Plant copper and single mode fiber cable.
  • Placed new manholes and building entries.
  • Installed new dedicated electrical circuits with disconnect switches and surge suppressors for new and existing data equipment.
  • Installed new voice and data wiring centers.
  • Installed, terminated and tested new fiber optic and copper cables for building POP extensions.
  • Project involved approximately 85 wiring centers.

Fort Benning, GA

  • Installed new dedicated electrical circuits with disconnect switches and hardwired surge suppressors for data equipment.
  • Installed new voice and data wiring centers with new data switches.
  • Installed, terminated and tested new fiber optic and copper cables for building POP extensions.
  • Included approximately 285 wiring center locations.

Nuclear Submarine Facility at Norfolk Naval Shipyard, VA

  • Installed 16,000 feet of 3” IMC threaded, galvanized conduit, 80 feet high, on specially designed brackets throughout the shipyard, providing the first in-port fiber connectivity for nuclear submarines.
  • Completed150 4-inch core bores.
  • Placed 4,000 feet of schedule 80 PVC.

Fort Drum, NY

  • Underground installation of Outside Plant copper and single mode fiber cable.
  • Placed new manholes and building entries.
  • Installed new dedicated electrical circuits with disconnect switches for data equipment.
  • Installed new voice and data wiring centers.
  • Installed, terminated and tested new fiber optic and copper cables for building POP extensions.

Minot AFB, ND (CITS Project)

  • Installed, terminated and tested new fiber optic cables for building POP extensions.
  • Installed UPS systems and network hardware in new and existing wiring centers for more than 60 buildings.